Granny Flat Cost in Sydney: Build, Plans and Approval Explained

What goes into the total cost of a granny flat, where the plans and approvals fit, and how to budget before you spend a dollar.

Granny flat cost in Sydney: the quick answer

The total cost of a granny flat is not one number. It is three costs added together: plans and approvals, the build itself, and site and connection work.

Plans and approvals are the smallest part of the total. They are also the part that can delay everything if they are wrong.

Quick answer

Price depends on size, your block, how services connect and the finish you choose. Ask for a fixed fee quote for plans and a written scope from your builder, so you can compare like with like.

What does a granny flat cost include?

Many people only think about the build price. A full budget covers four areas.

Plans and design

  • Concept drawings of the layout
  • Floor plans, elevations and sections
  • A site plan showing setbacks and boundaries
  • Drawings in the form your council or certifier needs

Approvals and reports

  • A BASIX certificate
  • A land survey, where one is needed
  • Structural engineering
  • Stormwater and drainage plans
  • Council or certifier fees
  • Extra reports for bushfire, flood or heritage land

The build

  • Foundations and structure
  • Kitchen, bathroom and laundry fit out
  • Windows, doors and finishes
  • Builder margin and insurance

Site and services

  • Water, sewer, power and stormwater connections
  • Site clearing and levelling
  • Access for trucks and equipment
  • Landscaping and paths

What affects the cost of a granny flat in Sydney?

Two granny flats of the same size can cost very different amounts. These are the main reasons.

Size and layout

More bedrooms and more wet areas cost more. A simple rectangular layout is usually cheaper to draw and build than a complex shape.

Your block

A steep slope, poor soil or tight access adds site work. Your drafter and builder should look at the block early.

Connections to services

The distance to the water and sewer connection, and the capacity of your power supply, can change the budget a lot.

Land controls

Bushfire, flood and heritage controls can mean extra reports and a higher standard of construction.

Design and finishes

Standard finishes keep costs down. Premium fixtures and custom joinery add to them.

The approval pathway

Whether you use a DA or a CDC affects the documents you need, the fees and the waiting time.

Granny flat approval: CDC or DA?

In NSW, a granny flat is called a secondary dwelling. Many can be approved as complying development, which is the faster pathway. Others need a development application with your council.

State planning rules generally limit the floor area of a secondary dwelling, and they set minimum lot sizes and setbacks. These rules change, so check your own lot before you commit to a design.

CDC and DA compared for a granny flat
CDCDA
Who approvesCouncil or a private certifierCouncil
When it suitsYour lot and design meet the state standardsYour lot or design falls outside the standards
SpeedUsually fasterUsually slower
Neighbour noticeNotice is given but there is no formal objection processNeighbours may comment

Read our guides on complying development certificates and the development application process to see which one fits.

Common granny flat budgeting mistakes

  1. Pricing only the build. Plans, approvals and connections are extra.
  2. Skipping the site check. Slope, soil and access are often found late.
  3. Choosing a design before checking your lot. The design may not meet the standards.
  4. Comparing totals only. Two quotes can cover different work.
  5. Leaving out a buffer. Surprises appear on almost every site.
  6. Forgetting future costs. Landscaping and furnishing add up.

How to compare granny flat quotes

  • Ask each provider for the same written scope
  • Check what is included for approvals and reports
  • Confirm who pays for service connections
  • Ask what is allowed for finishes and fixtures
  • Check how changes during the build are priced
  • Confirm the builder's licence and insurance

From idea to approval: the steps

  1. Check whether your lot can take a granny flat
  2. Set a budget that covers plans, approvals, build and site work
  3. Have the design drawn to suit your block
  4. Get the BASIX certificate and any reports
  5. Lodge for CDC or DA
  6. Use the approved plans to get builder quotes

Our granny flat drafting services in Sydney cover the plans, the BASIX certificate and the approval drawings.

Your next step

Tell us about your block and what you want to build. We will explain which approval you are likely to need and give you a fixed fee quote for the plans before any work begins.

Granny flat cost questions Sydney homeowners ask

How much does a granny flat cost in Sydney?

The total depends on size, site conditions, services and finishes. It is made up of plans and approvals, the build, and site and connection costs. Ask for written quotes for each part.

How much of the cost is plans and approvals?

It is the smallest part of the total, but it needs to be right. Errors in the drawings can lead to delays, changes and extra cost during the build.

Do I need council approval for a granny flat?

You need an approval, but it may come as a complying development certificate from a certifier or as a development application from council. It depends on your lot and design.

Do I need a BASIX certificate for a granny flat?

Yes. A new dwelling needs a BASIX certificate as part of the approval.

Can a draftsman design my granny flat?

Yes. Many granny flats are designed by draftsmen and building designers who prepare the drawings for approval.

How long does it take to get a granny flat approved?

It depends on the pathway and how complete your documents are. CDC is usually quicker than DA, but timing varies, so ask your drafter for an estimate.