Knockdown Rebuild Cost in Sydney: Demolition, Plans and Approvals
What a knockdown rebuild really costs once you add demolition, plans, approvals and living costs, and how to budget for each part.
Knockdown rebuild cost in Sydney: the quick answer
A knockdown rebuild has more parts than a normal build. You pay to remove the old house, plan the new one, get approval, build it and live somewhere else in the meantime.
Leave any one of those out and the budget will not hold.
Quick answer
Add up demolition, plans and approvals, the build, site and utility work, temporary accommodation and a buffer. Then compare the total with the cost of renovating or moving.
What is a knockdown rebuild?
A knockdown rebuild means demolishing your existing home and building a new one on the same block. It lets you start with a clean slate while staying on land you already own.
It is popular where the block is good but the house is old, small or in poor condition.
What does a knockdown rebuild cost include?
Before the build
- A site survey
- Soil and geotechnical testing
- Design and drawings
- BASIX certificate and other reports
- Council or certifier fees
Demolition and site preparation
- Disconnecting water, sewer, power and gas
- Demolishing the house
- Removing waste and any hazardous materials
- Protecting trees and neighbouring properties
- Clearing and levelling the site
The new home
- Foundations and structure
- Fit out and finishes
- Landscaping, driveway and fencing
- Builder margin and insurance
Living costs during the build
- Rent or other accommodation
- Storage for your belongings
- Moving costs
- Any holding costs on a loan
What can raise the cost of demolition?
Access to the block
Narrow driveways and tight streets make it harder to get machinery and trucks in and out.
Things below ground
Old pipes, tanks and footings can be found once the site is cleared.
Asbestos
Many older homes contain asbestos. Removal must be done by licensed people and adds cost and time.
Trees and neighbours
Protected trees and nearby buildings can limit how work is done.
Services
Disconnecting utilities properly takes coordination with providers.
Plans and approvals for a knockdown rebuild
A knockdown rebuild needs approval for the demolition and for the new home. Depending on your lot and design, this may come through a development application or a complying development certificate.
- A land survey
- Site analysis and design drawings
- A BASIX certificate
- Structural and stormwater plans
- Reports for bushfire, flood or heritage where they apply
- Council or certifier assessment
Heritage conservation areas and other controls can limit demolition, so check early. Our guide to the development application process explains the steps.
Our new home and knockdown rebuild drafting covers the drawings, BASIX and coordination with the surveyor and engineer.
Knockdown rebuild or renovation?
| Knockdown rebuild | Renovation | |
|---|---|---|
| Design freedom | Very high | Limited by the existing house |
| Living arrangements | You move out for the whole build | You may stay for some works |
| Costs | Demolition plus a full new build | Depends on how much you change |
| Approvals | Demolition and new dwelling | Alterations and additions |
| Materials and warranties | All new | Mix of old and new |
If your home is structurally sound, an extension or renovation may suit your budget better.
Ways to control the cost
- Get the survey and soil test early so the design suits the site
- Keep the design simple and compact
- Check for asbestos before you finalise the budget
- Ask a house remover whether parts of the home can be reused or sold
- Get fixed price quotes for demolition and the build
- Plan for temporary accommodation
- Keep a buffer
Your next step
Tell us about your block and what you want to build. We will explain the plans and approvals you need and give you a fixed fee quote for the drawings before any work begins.
Knockdown rebuild questions Sydney homeowners ask
How much does a knockdown rebuild cost in Sydney?
The total depends on the size and finish of the new home, the cost of demolition and site work, and your plans and approvals. Add living costs during the build and a buffer.
Do I need a separate approval for demolition?
Demolition needs approval too. It may be included in the same application as the new home or handled separately. Your drafter can advise.
Can I live in the house while it is rebuilt?
No. The house is demolished, so you will need somewhere else to live for the whole build.
How do I know if my house has asbestos?
Many homes built before the late 1980s may contain it. A licensed assessor can test materials before demolition.
Is a knockdown rebuild better than a renovation?
It depends on the condition of the house, your budget and how much you want to change. Compare the full cost and the design outcome of each.
What drawings do I need for a knockdown rebuild?
You need a site survey, site plan, floor plans, elevations, sections and the reports your council or certifier requires, including BASIX.