Second Storey Addition Cost in Sydney: What Affects the Price

What drives the price of building up, what plans and approvals you need first, and how to tell whether your house can take another level.

Second storey addition cost in Sydney: the quick answer

A second storey addition costs more than a simple ground floor extension of the same size. The reason is the structure, the stairs and the work on the roof.

Your final price depends on whether the existing house can carry the new level, how complex the design is and what the approval needs.

Quick answer

Before you set a budget, find out whether your footings and walls can support a new level. A structural check early on can save a lot of money later.

Why build up instead of out?

  • Keep your garden and outdoor space
  • Add bedrooms and bathrooms on a small block
  • Stay in the street and school zone you like
  • Gain views and privacy from the upper level
  • Avoid the cost and stress of moving

Building up is not always cheaper than building out. It suits blocks where there is little room to extend at ground level.

What affects the cost of a second storey addition?

Structure and footings

The existing walls and footings may need strengthening. An engineer should assess them.

Roof removal and weather protection

The old roof usually comes off and the house needs protection until the new roof is on.

Design complexity

A simple box on top costs less than a design with many angles, voids or large spans.

Stairs

Stairs need space on both levels, which can change the layout below.

Bathrooms and plumbing

New wet areas upstairs need plumbing runs. Placing them above existing wet areas can help.

Finishes

Standard fixtures keep costs down. Premium finishes add up quickly.

Site access

Tight streets and narrow side access can add costs for materials and equipment.

Approvals and professional fees

Plans, engineering, shadow diagrams, reports and council fees all add to the budget.

Living arrangements

You may need to move out during the build. Include the cost of temporary housing.

Contingency

Opening up an older house often reveals surprises. Keep a buffer.

Pros and cons of building up

Pros

  • Keeps your outdoor space
  • Adds a lot of living area
  • Can improve the value of the home
  • Avoids a move

Cons

  • Structural work can be costly
  • Height limits and neighbour impacts may apply
  • Disruption during the build
  • Longer build time than a small extension

Can your house take a second storey?

  • What are the existing footings and walls like?
  • How old is the house and what is it built from?
  • Does council allow the height you want?
  • Will the new level overshadow neighbours?
  • Is there room for stairs?
  • Are there heritage, bushfire or flood controls on your land?

A drafter and structural engineer can answer these before you spend on full plans.

Plans and approvals for a second storey addition

Most second storey additions need a development application or a complying development certificate. Either way, the drawings need to show the existing house and the new work clearly.

  • Floor plans for both levels
  • Elevations and sections
  • A site plan with setbacks
  • Shadow diagrams, where council asks for them
  • Structural details
  • A BASIX certificate

Our guide on council approval for renovations can help you check what applies.

Tips to keep your budget under control

  1. Fix your must haves before drawing
  2. Keep the design simple
  3. Stack wet areas over each other
  4. Get a structural check early
  5. Ask for fixed price quotes
  6. Plan where you will live during the build
  7. Keep a buffer

Your next step

Tell us about your house and what you want to add. We will tell you what drawings and approvals your project is likely to need and give you a fixed fee quote for the plans before any work begins.

Second storey addition questions Sydney homeowners ask

How much does a second storey addition cost in Sydney?

It depends on size, structure, design and finishes. Ask for written quotes for both the drawings and the build, and plan for a buffer.

Is a second storey addition cheaper than moving?

It can be, once you count agent fees, stamp duty and moving costs. Compare the full costs of both options.

Does my house need new footings?

Sometimes. A structural engineer should assess your existing footings and walls to see whether they can carry another level.

Do I need a DA for a second storey addition?

Most additions need a DA or a CDC. Your drafter can tell you which one fits your lot and design.

Will I need to move out during the build?

Often yes, at least for part of it, because the roof comes off and the work is disruptive. Plan for it in your budget.

How long does the design and approval take?

It varies with the design, the council and how complete your documents are. Ask your drafter for a realistic estimate.

Thinking about building up?

Send us your address and ideas. We will give you a fixed fee quote for the plans before any work begins.

Request a Fixed Fee Quote

0404 013 693 GET A QUOTE