Renovation Plans: Exempt, CDC or DA? A Room by Room Guide
Which approval pathway usually fits each type of renovation, how the three pathways differ and how long they can take.
Exempt, CDC or DA: the quick answer
There are three pathways for renovation work in NSW. Exempt development needs no approval. A complying development certificate is a fast track approval. A development application is the full council assessment.
Which one applies depends on what you are changing and what controls affect your land.
Quick answer
Minor work is often exempt. Standard projects that meet set standards can use a CDC. Anything that does not meet the standards, or sits on constrained land, usually needs a DA.
The three pathways explained
Exempt development
Minor work that meets set standards and needs no approval. You must still meet building and safety rules.
Complying development certificate (CDC)
A fast track approval issued by council or a private certifier for work that meets fixed state standards.
Development application (DA)
Council assesses your proposal against its local plans. It is more flexible, but it usually takes longer.
| Exempt | CDC | DA | |
|---|---|---|---|
| Approval needed | No | Yes, from a certifier or council | Yes, from council |
| Best for | Minor, low impact work | Standard work that meets the codes | Work that does not meet the codes or is on constrained land |
| Speed | Start when ready | Usually faster | Usually slower |
| Drawings | Rarely | Yes | Yes, with more documents |
| Neighbours | Not consulted | Notified, with limited input | May comment |
A room by room guide
This table is a general guide. Your land and the details of the work decide the real answer.
| Work | Likely pathway | What to watch |
|---|---|---|
| Painting, flooring, fixtures | Exempt | Heritage areas may add rules |
| Kitchen refit, no structural change | Often exempt | Plumbing and electrical rules still apply |
| Bathroom refit, same layout | Often exempt | Waterproofing and licensed plumbing |
| Removing an internal wall | Exempt, CDC or DA | Check whether it is load bearing |
| Garage conversion | CDC or DA | Light, ventilation, ceiling height and fire safety |
| Small deck or pergola | Often exempt | Size, height and distance to boundaries |
| Rear extension | CDC or DA | Setbacks, floor area and landscaped area |
| Second storey addition | CDC or DA | Height, shadows and neighbours |
| Granny flat | CDC or DA | Lot size and the state standards |
| Swimming pool | CDC or DA | Fencing and setbacks |
How do you know which one applies?
- Get a Section 10.7 planning certificate for your land
- Check for heritage, bushfire, flood and other overlays
- Compare your project with the exempt and complying standards
- Ask a draftsman or private certifier to confirm
- If the project does not fit, plan for a DA
How long do the pathways take?
Timeframes vary with the council or certifier, the complexity of the work and how complete your documents are. Exempt work can start straight away. A CDC is usually quicker than a DA. A DA can take longer, especially if council asks for more information.
Ask your drafter for a realistic estimate for your project.
What drawings do you need for each pathway?
- Exempt: often none, but a sketch helps your builder
- CDC: site plan, floor plans, elevations, sections and a BASIX certificate where required
- DA: the same drawings plus any extra reports council asks for, such as shadow diagrams or a statement of environmental effects
Our guides to the development application process, complying development certificates and BASIX certificates explain the documents in more detail.
Mistakes to avoid
- Assuming your project is exempt without checking
- Ignoring heritage or bushfire controls
- Choosing a CDC when the project does not meet the standards
- Starting work before approval
- Underestimating how long a DA can take
- Booking a builder before plans are ready
Your next step
Tell us about your renovation. We will explain which pathway is likely to fit and prepare the drawings you need.
Choosing between a CDC and a DA for the whole project? See DA vs CDC: which pathway does your project qualify for.
Renovation approval pathway questions
What is the difference between a DA and a CDC?
A DA is assessed by council against local plans. A CDC is a faster approval for work that meets fixed state standards, and it can be issued by a private certifier.
Is my renovation exempt?
It may be if it is minor and meets the standards. Check your land for controls and ask a draftsman or certifier to confirm.
Can I use a CDC for any renovation?
No. A CDC only applies if your project and your land meet the standards. Otherwise you need a DA.
Do I need drawings for an exempt renovation?
Often not, but plans help your builder and can avoid mistakes.
Which is faster, a DA or a CDC?
A CDC is usually faster. Actual times depend on the certifier or council and the quality of your documents.
Do I need a BASIX certificate?
BASIX is generally required for alterations above a set value and for new dwellings. Your drafter can confirm for your project.
Not sure which approval your renovation needs?
Tell us about your project. We will explain which drawings and approvals it needs and give you a fixed fee quote before any work begins.