Do You Need a DA for a House Extension in Sydney?

A direct answer on extension approvals, the three pathways, what makes a project eligible for a CDC and what drawings you will need.

Do you need a DA for a house extension? The quick answer

Often yes, but not always. A house extension needs one of three things: nothing, a complying development certificate (CDC), or a development application (DA). Which one depends on the size of the work and your land.

Most extensions of any real size need approval. A CDC is the faster route when your project and your land meet the state standards. A DA is the fallback when they do not.

Quick answer

Small, minor work may be exempt. Standard extensions on eligible land can use a CDC. Extensions that do not meet the standards, or sit on constrained land, need a DA.

The three approval paths for an extension

No approval: exempt development

  • Only for minor, low impact work
  • Must meet set standards
  • A full extension rarely qualifies

Certifier approval: CDC

  • Issued by council or a private certifier
  • Works when the project meets fixed standards
  • Usually faster than a DA

Council approval: DA

  • Council assesses the proposal against its local plans
  • Needed when the project does not meet the CDC standards
  • Allows more design flexibility but takes longer

What decides whether you can use a CDC?

A CDC needs both your land and your design to qualify. The tests are set by state planning rules, and they change from time to time, so always check the current version.

Tests for the land

  • The zone your land sits in
  • The size and width of your lot
  • Whether your land has heritage, flood, bushfire or other controls
  • Whether your land is excluded from complying development

Tests for the design

  • Height and number of storeys
  • Setbacks from boundaries
  • Floor area and landscaped area
  • Privacy and overshadowing standards

A Section 10.7 planning certificate lists the controls on your land. It is a good first step.

What about a second storey?

Adding an upper level is an extension too. It follows the same pathways, but height, overshadowing and privacy matter more. Many upper level additions need a DA, and some can use a CDC if they meet the standards.

See our guide to second storey additions versus extending out.

What drawings and documents do you need?

  • A site plan with setbacks and boundaries
  • Floor plans of the existing and proposed layouts
  • Elevations and sections
  • A BASIX certificate
  • Structural details
  • Shadow diagrams, where council asks for them
  • Extra reports for heritage, bushfire or flood, if they apply

Read our guides on the development application process and complying development certificates.

House Plan Design & Drafting's services page lists the drawings we prepare for extensions.

How long does extension approval take?

Timeframes vary with the pathway, the council or certifier and how complete your documents are. A CDC is usually quicker than a DA. A DA can take longer, especially if council asks for more information.

Ask your drafter for a realistic estimate for your project.

The steps to get an extension approved

  1. Get a Section 10.7 planning certificate for your land
  2. Write your brief and budget
  3. Ask a drafter which pathway fits
  4. Get a survey if one is needed
  5. Have the drawings and BASIX certificate prepared
  6. Lodge the application
  7. Respond to any questions from council or the certifier
  8. Start building only after approval

Your next step

Tell us about your extension. We will check your land, explain which pathway is likely to fit and prepare the drawings you need.

For the five eligibility tests in one place, see DA vs CDC: which pathway does your project qualify for.

Extension approval questions Sydney homeowners ask

Do I need council approval for a home extension in Sydney?

Most extensions need approval, either a CDC from a certifier or a DA from council. Only minor work is exempt.

Can a house extension be approved as a CDC?

Yes, if your land and your design meet the state standards. Otherwise you need a DA.

What approvals are needed for an extension?

Usually a CDC or a DA, plus a BASIX certificate. After that, a construction certificate is needed before building starts.

How long does extension approval take?

It depends on the pathway and the quality of your documents. A CDC is usually faster than a DA.

Does a second storey need a DA?

Often, because height and overshadowing matter. Some can use a CDC if they meet the standards.

How do I find out which controls apply to my land?

Get a Section 10.7 planning certificate and ask a draftsman or certifier to review it.

Planning an extension in Sydney?

Tell us about your project. We will explain which drawings and approvals it needs and give you a fixed fee quote before any work begins.

Request a Fixed Fee Quote