What Is a Development Application (DA) in Sydney and How Long Does It Take?
What a DA is, when you need one, the stages from concept to determination and what affects how long it takes.
What is a DA? The quick answer
A development application (DA) is a formal request to your council for permission to build, change or demolish something. Council assesses it against local planning rules and decides whether to approve it.
How long it takes depends on your council, the size of the project and how complete your drawings are. Plan for weeks at the short end and many months for complex or disputed projects.
Quick answer
A DA gives you development consent. After consent you still need a construction certificate before building can start.
You usually need a DA for
- A new home or knockdown rebuild that does not suit a CDC
- A second storey or large extension
- Work on a heritage item or in a heritage conservation area
- A dual occupancy or secondary dwelling that cannot use a CDC
- Demolition that needs consent
- Change of use, such as a home business
Do I need a DA, a CDC or neither?
There are three main levels of approval for building work.
Exempt development
Small, low impact work such as some minor structures can go ahead with no approval, if it meets set rules.
Complying development certificate (CDC)
A fast approval for designs that meet fixed standards on eligible land. See our guide to DA vs CDC.
Development application
Everything else that needs consent. Council assesses it on its merits.
The DA process, stage by stage
1. Concept and site checks
Look at your land, your zoning and the controls that apply. A planning certificate from council shows many of them. Decide what you want to build.
2. Prepare the DA
Your drafter prepares the drawings and supporting documents. Good preparation avoids delays later.
3. Lodge
The application and fee go to council, usually online. Council checks that it is complete.
4. Assessment
A council planner reviews the design against the rules, considers neighbours' views and may ask for changes or more information. Questions from council can pause the process until you reply.
5. Determination
Council approves, approves with conditions or refuses. Most approvals come with conditions you must meet.
6. After consent
Meet the conditions, obtain a construction certificate and appoint a certifier before you start building. Our page on why a DA is required explains the purpose, and our development application process guide covers each step.
Documents a DA usually needs
- A land survey
- Site plan, floor plans, elevations and sections
- Shadow diagrams where overshadowing matters
- A BASIX certificate
- A statement describing the proposal and how it meets the rules
- Stormwater and drainage plans
- Reports for heritage, flood, bushfire or trees where they apply
- Details of materials and finishes
Councils differ, so confirm their checklist before you lodge.
How long does a DA take?
There is no single answer. Several things change the timeline.
- Your council and its workload
- How complete the application is when lodged
- Whether council asks for more information
- Neighbour objections
- Heritage, flood or other referrals to other agencies
- How quickly you respond to questions
The best way to shorten a DA is to submit a complete, well drawn application the first time.
What affects the cost
- Council application and assessment fees, which often depend on the value of the work
- Drawings and documents prepared by your drafter
- Specialist reports, such as survey, heritage or arborist
- BASIX and related certificates
- Further changes if council asks for them
Ask for a written quote that lists what is included.
Common mistakes
- Lodging before checking planning controls
- Submitting drawings that are incomplete or inconsistent
- Ignoring neighbours' concerns until they object
- Delaying replies to council questions
- Assuming consent lets you start building straight away
- Changing the design after consent without checking if the approval needs to be modified
Your next step
Send us your address and your idea. We will check the controls on your land, prepare the drawings and documents for a DA and quote a fixed fee before any work begins.
Once you have consent, read how a construction certificate works.
Development application questions Sydney homeowners ask
How long does a DA take in Sydney?
It varies by council, project size and how complete your application is. Simple projects can take weeks. Complex or contested ones can take many months.
Can I start building once my DA is approved?
Not yet. You also need a construction certificate and a principal certifier, and any conditions that apply before work starts must be met.
What happens if my DA is refused?
You may be able to change the design and try again, ask for a review or appeal. A drafter can advise on the best option.
Will my neighbours be told about my DA?
Usually, yes. Councils notify nearby owners and consider their comments.
How long does DA consent last?
Consent typically lapses if work does not begin within a set period, commonly five years. Check the dates on your consent.
Can I change my plans after approval?
Small changes may be allowed through a modification. Larger changes may need a new application. Ask before you change anything.