First Floor Additions: Structure, Stairs and Council Rules

What a first floor addition involves, from the structure and the stairs to council rules, drawings and the way the build runs.

First floor additions: the quick answer

A first floor addition adds a new level on top of your existing house. It works best when the house can carry the extra load, there is room for stairs and council rules allow the height.

Three things shape every first floor addition: the structure below, the stairs between levels and the rules about height, shadows and privacy.

Quick answer

Get a structural check early, plan the stairs at the start of the design and check council height and overshadowing rules before you fall in love with a layout.

The structure: can your house carry a new level?

The ground level has to carry the new level above it. An engineer checks the parts that matter.

  • Existing footings and slab
  • Walls that will carry the new load
  • The roof structure, which is usually removed and rebuilt
  • The floor between levels
  • Steel beams where openings need support
  • Bracing for wind and movement

Older homes and homes on reactive soils may need more work. An early structural opinion avoids surprises later.

Stairs: where do they go?

Stairs are one of the biggest design decisions in a first floor addition. They take space on both levels and affect the layout below.

What to think about

  • Where the stairs start and finish
  • Whether they are straight, turning or open
  • Headroom and clear space at the top
  • Natural light into the stairwell
  • How the stairs affect the rooms downstairs
  • Safety and building code requirements

A drafter can test stair positions in the early concept drawings, before the rest of the layout is locked in.

Council rules that affect a first floor addition

Common council concerns
RuleWhat it looks at
HeightHow tall the building can be and how many storeys
SetbacksDistance from the building to each boundary
OvershadowingHow much shade the new level casts on neighbours
PrivacyWindows and balconies that look into neighbouring homes
Floor area and landscaped areaHow much of the block the building and gardens cover
Heritage and characterControls in conservation areas and for listed homes

Rules differ by council and zone. Your drafter can check the controls that apply to your lot.

Planning a first floor addition in the Shire? Read about Sutherland Shire LEP and DCP controls on our local page.

Approvals for a first floor addition

Most first floor additions need a development application or a complying development certificate, plus a BASIX certificate. Our guide on whether you need a DA for a house extension explains how to tell which one fits.

Drawings you will need

  • A site plan
  • Floor plans for both levels
  • Elevations and sections
  • Structural details from an engineer
  • A BASIX certificate
  • Shadow diagrams, where council asks for them

How the build usually runs

  1. Approval and construction certificate
  2. Site set up and protection for the existing house
  3. Roof removal and temporary weather protection
  4. New floor structure and walls
  5. New roof
  6. Stairs, services and internal fit out
  7. Final inspections and certificates

Many owners move out for some or all of the build. Plan for that in your budget.

Checklist before you commit

  • An engineer has confirmed the structure can carry a new level
  • The stair position suits the layout
  • Council height and overshadowing rules are met
  • Neighbours' privacy has been considered
  • BASIX and other reports are planned
  • You have a budget that includes drawings, approvals and a buffer

For the cost side, read our guide to second storey addition costs. You can also see our first floor addition project.

Your next step

Thinking about building up? Tell us about your house. We will check the planning rules and prepare drawings that suit your structure and your stairs.

First floor addition questions Sydney homeowners ask

What is a first floor addition?

It is a new level built on top of an existing single storey house, usually with new stairs and a new roof.

Does my house need new footings?

Sometimes. An engineer should check the existing footings and walls before you design the new level.

Where should the stairs go?

Stairs are best planned at the start of the design, so they suit the layout on both levels.

Will council allow a first floor addition?

It depends on height, setbacks, overshadowing, privacy and any heritage controls on your lot.

Do I need to move out?

Often for part of the build, because the roof comes off. Plan for temporary accommodation.

How long does the design take?

It varies with the design and approval path. Ask your drafter for a realistic estimate.

Planning a first floor addition in Sydney?

Tell us about your project. We will explain which drawings and approvals it needs and give you a fixed fee quote before any work begins.

Request a Fixed Fee Quote